[12-18-12] -- New release of the CAVS algorithm validation testing tool to the CST Laboratories (CAVS14.2). This version of the CAVS tool addresses minor updates:
The transition period ends March 18, 2013.
As has been the policy in the past:
The CAVP will also review special conditions on a case-by-case basis.
[10-02-12] -- New release of the CAVS algorithm validation testing tool to the CST Laboratories (CAVS14.1). This version of the CAVS tool addresses:
The transition period ends January 2, 2013.
As has been the policy in the past:
The CAVP will also review special conditions on a case-by-case basis.
[08-28-12] -- Changed second bullet on CAVS 14.0 release instructions listed below for [08-20-12]. For any GCM/GMAC implementation validation request that doesn’t currently have a validation number assigned to it, where a lab has used a version of CAVS prior to CAVS 14.0 to create files, regardless if the values have been sent to the vendor or not, please regenerate the GCM/GMAC tests using CAVS 14.0 or CAVS12.2 following the instructions supplied to the laboratories. Additional information from the vender regarding the Plaintext and AAD lengths supported by the IUT will be required to complete the testing.
[08-20-12] -- New release of the CAVS algorithm validation testing tool to the CST Laboratories (CAVS14.0). This version of the CAVS tool addresses:
The transition period ends November 20, 2012.
As has been the policy in the past:
The CAVP will also review special conditions on a case-by-case basis.
[05-30-12] -- New release of the CAVS algorithm validation testing tool to the CST Laboratories (CAVS12.2). This version of the CAVS tool addresses:
The transition period ends August 30, 2012.
As has been the policy in the past:
The CAVP will also review special conditions on a case-by-case basis.
[05-22-12] -- New release of the CAVS algorithm validation testing tool to the CST Laboratories(CAVS12.1). This version of the CAVS tool addresses:
The transition period ends August 22, 2012.
As has been the policy in the past:
The CAVP will also review special conditions on a case-by-case basis.
[03-23-12] -- New release of the CAVS algorithm validation testing tool to the CST Laboratories (CAVS12.0). This version of the CAVS tool addresses:
The transition period ends June 23, 2012.
As has been the policy in the past:
The CAVP will also review special conditions on a case-by-case basis.
Security and Privacy: assurance, cryptography, testing & validation